Quick Summary

This page provides an indicative design for a 200 KLD (200,000 L/day) Sewage Treatment Plant using the Activated Sludge Process (ASP). All calculations are shown step-by-step and are to be finalized after site visit and sample analysis (jar test). Design assumptions: Influent BOD ≈ 300 mg/L, target removal ~80%, 20 hr/day operation.

Design Calculations — step by step

Given / Assumed:
Design daily flow (Qd) = 200,000 L/day (200 KLD)
Operating hours = 20 hours/day
Influent BOD (assumed) = 300 mg/L
BOD removal target = 80%
Oxygen requirement = 1.5 kg O2 per kg BOD removed
O2 in air ≈ 0.278 kg O2 per m³ air
Design transfer efficiency (conservative) = 10%

Flow & Mass calculations (digit-by-digit)

1) Design hourly flow (Qh)
Qh = Qd / operating hours = 200,000 L / 20 h = 10,000 L/h.

2) BOD mass/day
Influent BOD = 300 mg/L = 0.300 g/L.
BOD mass/day = 200,000 L × 300 mg/L = 200,000 × 300 mg = 60,000,000 mg = 60,000 g = 60.000 kg/day.

3) BOD removed (80%)
Removed BOD = 60.000 kg/day × 0.80 = 48.000 kg/day.

4) Oxygen demand (1.5 kg O2 / kg BOD removed)
O2 required = 48.000 kg/day × 1.5 = 72.000 kg O2/day.

5) Air required (using 0.278 kg O2/m³ air and 10% transfer)
Effective O2 per m³ (with 10% transfer) = 0.278 kg × 0.10 = 0.0278 kg O2/m³ air.
Air (m³/day) = 72.000 / 0.0278 = 72.000 / 0.0278 ≈ 2,590.650 m³/day.
Air (m³/hour) = 2,590.650 / 20 h = 129.533 m³/hr.
Recommendation: Provide blowers totalling ~ 140–180 m³/hr (split into 2 units for duty + standby) to give margin and account for media mixing, head loss and scouring where applicable.

6) Power estimate (approximate)
From 100 KLD estimate (≈30–40 HP total installed), scaling roughly ×2 → rough installed motor power: 60 – 80 HP total (pumps + blowers + sludge systems). Blower motor(s) combined approx: 15 – 30 HP depending on blower type; final selection after vendor datasheets.

Tank Sizing & Unit Volumes (20 h operation)

Design hourly flow = 10,000 L/h. HRTs are conservative and practical; volumes rounded to nearest practical tank sizes.

Unit HRT / Note Calculated Volume (L) Rounded / Practical (m³)
Equalization / Collection Tank (with disc diffusers) 6 hours 10,000 × 6 = 60,000 L 60 m³
Bar screen & Grit / O&G chamber 0.5–1 hour ~10,000 L 10 m³
Aeration Tank (ASP) 6 hours (typical) 10,000 × 6 = 60,000 L 60 m³
Secondary Clarifier (Settling) 2 hours 10,000 × 2 = 20,000 L 20 m³
Clarified Water / Buffer Tank (PSF feed) Buffer ~3,000 – 5,000 L 3 – 5 m³
Pressure Sand Filter / Activated Carbon Filter Pressure vessels sized per flow — —
Final Treated Water Tank (Reuse buffer) Buffer for reuse ~10,000 L 10 m³
Sludge holding / Thickener Intermediate storage ~2,000 – 4,000 L 2–4 m³
Total (approx.) ~145,000 L (excluding PSF/ACF vessels) ~145 m³

Notes: You can combine EQ + primary in one tank, or use prefabricated modular tanks (FRP/GRP) to reduce civil time. Rectangular tanks reduce footprint compared to circular clarifiers. Final site layout affects practical tank geometry and footprint.

Process Flow (ASP) — Sequence

Toilets & Wastewater →
Bar Screen (coarse removal) →
Oil & Grit / O&G Trap →
Collection / Equalization Tank (disc diffusers for mixing & prevent septicity) →
Raw Sewage Transfer Pump (cutter/grinding pump option if rags/solids expected) →
Aeration Tank (Activated Sludge — MLSS + diffused air) →
Secondary Settling Tank (Clarifier) — sludge settled; RAS pumped back to aeration; excess sludge → sludge holding & dewatering →
Clarified Water Tank → Filter Feed Pump → Pressure Sand Filter (PSF) → Activated Carbon Filter (ACF) → Hypochlorite Dosing (online dosing pump) → Final Treated Water Tank (Reuse).

For higher reuse quality (RO feed / cooling tower), include UF/RO & boosters. For gardening, toilet flushing, and vehicle wash — PSF + ACF + disinfection is typically adequate.

Equipment, Materials & Controls

Item Recommended Specification / Note
Bar Screen Coarse screen with manual or raked option at inlet
O&G Trap Oil & grease separator with skimmer arrangement
Equalization Tank Disc diffusers for mixing; RCC / MS epoxy lined / FRP options
Raw Sewage Transfer Pump Sewage cutter pump (capable of handling rags) — 2 nos (duty + standby)
Aeration System Fine bubble diffusers + blower(s). Air required ~ 2,591 m³/day → ~ 130 m³/hr. Recommend blower capacity 140–180 m³/hr (2 nos) for margin and redundancy.
Secondary Clarifier Rectangular/circular clarifier with RAS pump & scum removal; hopper bottom for sludge collection
Filters PSF & ACF sized for 200 KLD peak flow (pressure vessels)
Dosing Pumps Coagulant / Polymer (if required), Hypo dosing pump (online) for disinfection
Sludge Handling Sludge holding tank, dewatering by filter press or drying bed + waste sludge pump
Control Panel PLC based control, level sensors, DO controller, alarms; remote monitoring optional
MOC (Tanks) RCC (buried/permanent) / MS (epoxy lined) / FRP with rubber lining — choose based on site & corrosivity

Blower & air notes: select blower(s) after vendor quote; include duty + standby. Pumps sized for peak flow with one duty + one standby where possible.

Expected Performance & Reuse

Parameter Influent (Design) Typical Treated (After PSF+ACF+Disinfection)
pH 6.5 – 7.5 6.5 – 7.5
BOD ~300 mg/L < 30 mg/L
COD ~900 mg/L < 200 mg/L (site dependent)
TSS ~150 mg/L < 30 mg/L
Oil & Grease ~50 mg/L < 5 mg/L

Typical reuse: gardening, toilet flushing, car wash, pavement wash. For high-quality reuse (RO feed / critical applications) include UF/RO and perform lab validation.

Operation & Maintenance (Key Points)

  • Maintain Dissolved Oxygen in aeration: 2.0 – 3.5 mg/L. Monitor online if possible.
  • Monitor MLSS & SVI; typical MLSS for ASP: 2000–3500 mg/L (adjust based on performance).
  • Check and clean diffusers; replace worn diffusers periodically.
  • Maintain sludge wasting schedule; expect proportionally higher sludge volumes compared to 100 KLD.
  • Maintain dosing chemical stocks (coagulant / polymer / hypochlorite).
  • Keep detailed logbook for TNPCB/CPCB inspections and compliance.

Get Quick Quotation / Technical Proposal

Free site visit & jar test for final design & price. Send site photos, sample report (if available) and project brief.

📲 Get Technical Proposal on WhatsApp






WhatsApp

Contact
Sales / Technical: +91 97100 35249 • Service: +91 99623 95875 • Email: rrrenviro@gmail.com

RRR ENVIRO SYSTEMS · 200 KLD ASP STP · Est. 2011 · ISO 9001:2015