Effluent Treatment Plant (ETP) Manufacturer Chennai | Industrial ETP Solutions

Effluent Treatment Plant (ETP) – Design, Supply & Commissioning

Turnkey ETP solutions for industrial effluents. We design physico-chemical & biological treatment trains, MBBR/ASP/Package ETPs, & ZLD-ready systems. Capacities: 10 KLD → 300 KLD.

Why choose RRR ENVIRO for ETP?

  • In-house engineering with pilot-scale testing & lab analysis
  • TNPCB/CPCB compliant designs, full documentation & approvals assistance
  • Custom treatment trains: physico-chemical, biological, MBBR, SBR, clarification & sludge handling
  • Turnkey scope: civil, mechanical, piping, electrical, control panels & commissioning
  • Guaranteed performance & AMC packages with spare parts supply

ETP Capacities & Typical Applications

Capacities

  • 10 KLD, 20 KLD, 30 KLD, 50 KLD
  • 100 KLD, 150 KLD, 200 KLD, 300 KLD

Industries

  • Textile & Dyeing
  • Food & Beverage / Dairy
  • Chemical & Pharma
  • Cement & Construction
  • Electroplating & Metal Finishing

Common ETP Treatment Train (Typical)

  1. Inlet / Screening → Oil & Grease Trap → Equalization
  2. pH Correction → Coagulation / Flocculation → Primary Clarifier
  3. Biological Treatment (ASP / MBBR / SBR) → Secondary Clarifier
  4. Sand Filtration → Activated Carbon → Disinfection (Hypo / UV)
  5. Sludge Dewatering → Drying / Safe Disposal / Cake handling

Key Features

  • Custom MOC: RCC / MS / FRP / HDPE lining as per corrosive effluent
  • Auto dosing systems for coagulant & pH adjusters
  • PLC / SCADA optional with remote monitoring
  • Energy efficient blowers, frequency-driven pumps & optimized aeration
  • Designed for low sludge generation & easy O&M

Performance Guarantees & Testing

We conduct inlet characterization (TDS, BOD, COD, TSS, Oil & Grease, pH) and provide performance guaranteed values for outlet discharge as per TNPCB/CPCB norms. Pilot trials available for special effluents.

ETP Process Comparison (Quick View)

ProcessBest forSludge
Physico-Chemical + ClarifierHigh strength industrial effluentHigh
MBBRCompact footprint, variable loadLow
SBRBatch loads, automationMedium
MBRZero turbidity, reuseLow (membrane cake)

Frequently Asked Questions

How long to install a 50 KLD ETP?

Typical civil & mechanical installation for 50 KLD ETP takes 4–6 weeks depending on site readiness and civil scope.

Do you handle hazardous / high COD effluents?

Yes. For high COD effluent we provide physico-chemical pre-treatment and advanced oxidation / thermal options or ZLD if required.

Do you provide sample testing & pilot plant?

Yes, we perform lab testing and onsite pilot trials to validate design before full scale installation.

© RRR ENVIRO SYSTEMS — Effluent Treatment Plants | Turnkey ETP Contractor Chennai · Email: rrrenviro@gmail.com · Phone: +91 97100 35249